Advancing economic prosperity and protecting fresh water across the Great Lakes and St. Lawrence River Region.

Resilience Initiatives for Resilient Cities

The Great Lakes & St. Lawrence Cities Initiative administers two U.S. Coastal Resilience Initiatives: the Initiative for Resilient Great Lakes Coasts and the Resilient Coastal Projects Initiative. Both programs provide advanced capacity for engineering and designing restoration projects in coastal communities, with the goal of advancing projects through the implementation pipeline. The map below shows the different projects to date funded through these programs across the Great Lakes region.

15th Avenue Stormwater Solutions, Gary, IN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding

Solution

Green infrastructure, hybrid ditches, tree plantingss, stormwater infrastructure

Addressing Erosion and Flooding Threats to Highway 13 and Thompson Creek, Washburn, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure, habitat loss, flooding, water quality

Solution

Streambank stabilization, infrastructure imrpovements, channel naturalization

Alpena Water Treatment Plant Protection and Starlite Beach Improvement, Alpena, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

Project Implementation Framework + 30% Design

Hazard

Erosion, stormwater runoff, water quality

Solution

Cobble berm/dynamic revetment, vegetated berm, vegetated revetment

Au Gres Harbor Sedimentation Control, Au Gres, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Water quality

Solution

Habitat restoration, flood capacity via sediment re-direct

Bay City Creek Estuary Wetland Restoration and Living Shoreline Implementation, Ashland, WI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

Project Implementation Framework + 30% Design

Hazard

Stormwater runoff, erosion, water quality, invasive species

Solution

Habitat restoration, species management, woody headlands, mudpuppy reefs

Bay City Veterans Memorial Park Shoreline Restoration, Bay City, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Project Implementation Framework + 90% Design

Hazard

Failing infrastructure, flooding, erosion

Solution

Shoreline softening, native vegetation, shoreline stabilization, planted revetment, public access

Bay Mills Indian Community Bluff Restoration Project, Bay Mills Indian Community, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

30% Design

Hazard

Erosion, lake levels, failing infrastructure, threat to cultural resources

Solution

Groin removal, beach nourisment, native plantings

Bayfront Park East, Petoskey, MI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

90% Design

Hazard

Erosion

Solution

Cobble berm/dynamic revetment, native plantings

Bayfront Park West/Solanus Mission Beach, Petoskey, MI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Erosion

Solution

Cobble beach, native plantings

Beach Restoration and Shoreline Stabilization, St. Joseph, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, lake levels

Solution

Beach nourishment

Beach Street Beach Restoration and Stabilization, Muskegon, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, lake levels

Solution

Beach nourishment

Beaver Park Restoration (formerly BASF Park), Wyandotte, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Grant Matrix/Funding Strategy + 60% Design

Hazard

Habitat loss, stormwater runoff

Solution

Invasive species management, native plantings, rain garden, accessibility improvements

Beverly Shores East Shoreline Restoration & Security, Beverly Shores, IN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Lake levels, erosion, stormwater runoff

Solution

Green infrastructure, shoreline protection, revetment structure improvements, shoreline softening

Bluff Stabilization, Milwaukee County, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Erosion, lake levels

Solution

Shoreline stabilization

Boardman/Ottaway Riverfront Improvements, Traverse City, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Stormwater runoff, access issues

Solution

Accessibility improvements, green infrastructure, stormwater infrastructure

Buckeye Beach Stabilization and Restoration, Geneva-on-the-Lake, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion

Solution

Shoreline softening, shoreline stabilization, beach restoration, accessibility improvements

Chapaton Shoreline Restoration and Habitat Enhancements Project, Macomb County, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Project Implementation Framework + 60% Design + 90% Design (pending)

Hazard

Flooding, erosion, lake levels

Solution

Shoreline softening, wetland creation, native plantings, accessibility improvements

Cheboygan Downtown Riverwalk Greenway, Cheboygan, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design + 90% Design (pending)

Hazard

Erosion, failing infrastructure, access issues, habitat loss

Solution

Shoreline softenting, accessibility improvements, native plantings, public education + outreach

City of Frankfort Lake Michigan Coastal Resiliency Project, Frankfort, MI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

30% Design

Hazard

Erosion

Solution

Bluff revegetation, toe protection, native plantings

Clark Street Beach, Evanston, MI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

Dune Management Manual

Hazard

Erosion

Solution

Dune management

Clean Water Recover Facility Area Protection and Restoration, Manistee, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Flooding, erosion, lake levels

Solution

Shoreline softening, habitat restoration, flood protection berms

Coastal Resilience and Flood Protection – Gibraltar, Gibraltar, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Lake levels, flooding, erosion

Solution

Infrastructure improvements, stormwater management

Coastal Resilience and Flood Protection – Grosse Ile, Grosse Ile, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Lake levels, flooding, erosion

Solution

Infrastructure improvements, flood mitigation

Community Shoreline Improvements, Estral Beach, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Flooding, stormwater runoff

Solution

Maintenance of flood control structures, stormwater infrastructure

Community-wide Brownfield Inventory & Remediation Prioritization, DCC, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Access issues, brownfield(s)

Solution

Comprehensive plan re: redeveloping brownfields for economic redevelopment

Creating a Resilient Waterfront Parkland in Two Rivers, Two Rivers, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design + 90% Design (pending)

Hazard

Erosion, water quality, stormwater runoff, failing infrastructure

Solution

Offshore reefs, beach nourishment, bluff revegetation, green stormwater infrastructure, accessibility improvements

Cunningham Street Stormwater and Outfall Improvements, DeTour Village, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Stormwater runoff

Solution

Green infrastucture, infrastructure improvements, accessibility improvements

DeSan Park Improvements, Richmond Heights, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, habitat loss

Solution

Green infrastructure, modeling, habitat restoration

Dune Restoration and Public Beach Access, Grand Beach, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure

Solution

Shoreline stabilization, native plantings, infrastructure improvements, accessibility improvements

Durand Eastman Park Green Infrastructure Project​, Rochester, NY

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Failing infrastructure

Solution

Green infrastructure​, stormwater infrastructure, accessibility improvements

East Chicago Marina Revitalization and Ecological Enhancement, East Chicago, IN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, stormwater runoff, water quality, failing infrastructure, access issues, habitat loss

Solution

Green infrastructure, accessibility improvements, habitat creation

East River Flood Solutions at Emilie Park, Green Bay, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Flood Mitigation Strategy + Implementation (pending)

Hazard

Flooding

Solution

Floodplain restoration, wetland creation, stormwater management, habitat creation, accessibility improvements

East River Flood Solutions at Van Beaver Park, Green Bay, WI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Flood Mitigation Strategy + 90% Design

Hazard

Flooding, stormwater runoff, water quality, lake levels

Solution

Wetland reestablishment, native plantings, shoreline stabilization, species management, accessibility improvements

East Tawas Shoreline Protection and Aquatic Habitat Enhancement, East Tawas, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, stormwater runoff

Solution

Shoreline softening, shoreline stabilization, daylighting, native plantings

Ecorse Creek Floodplain Restoration – 9th Street, Ecorse, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Project Implementation Framework + 60% Design

Hazard

Stormwater runoff, flooding, erosion, water quality

Solution

Native plantings, pollinator field, accessibility improvements, species management

Enhancing Coastal Resilience Sustainability at Maslowski Beach, Ashland, WI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Erosion, water quality, stormwater runoff

Solution

Dune establishment, shorebird habitat establishment, vegetated revetment, rain gardens, pollinator garden

Enhancing Hydrologic Function of the Au Train River, Au Train, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, water quality

Solution

River restoration, infrastructure improvements

Environmental Site Assessment at Verplank Property, Muskegon, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Brownfield(s)

Solution

Site remediation, accessibility improvements

Erosion Mitigation at Eagle River Mouth, Houghton Township, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, shoreline erosion

Solution

Native plantings, fish passage culvert, shoreline stabilization berm, in channel vanes

Euclid to Sims Park Erosion Control and Public Access, Euclid, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 30% Design (pending)

Hazard

Erosion, stormwater runoff, access issues

Solution

Hybrid green-grey breakwater, cobble beach, stormwater treatment and infrastructure updates, shoreline trail, nearshore habitat

Grand Marais Harbor Shoreline Protection and Habitat Enhancement Project, Grand Marais, MN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design

Hazard

Erosion, water quality, stormwater runoff, failing infrastructure

Solution

Green infrastructure, beach nourishment, shoreline stabilization, habitat creation

Grass River and Shoreline Restoration Project, Massena, NY

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, habitat loss, stormwater runoff

Solution

Shoreline softening, wetland restoration, accessibility improvements

Green Stormwater Infrastructure at Toth Park, Bridgman, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, stormwater runoff, water quality

Solution

Native plantings, rain gardens, infiltration basins, city-wide stormwater and drainage assessment

Harbor Drive Erosion Assessment and Restoration Planning, Saxon, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion

Solution

Shoreline stabilization

Improving Habitat and Water Quality at Forest Park, Lake Forest, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure

Solution

Native dune plantings, stormwater study, green infrastructure, infrastructure improvements

Infrastructure Protection and Shoreline Stabilization at Foss Park, North Chicago, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, habitat loss, failing infrastructure

Solution

Bluff stabilization, enhance natural habitats, accessibility improvements

Jackson Park Lagoon Shoreline Restoration, Chicago, IL

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Erosion

Solution

Shoreline stabilization, native vegetation, cobble beach

Kiddie Beach to Wickham Blvd Recreation Space Conversion ​, Sodus Point, NY

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Sand migration, water quality, access issues, stormwater runoff

Solution

Wind-breaking vegetation and structures, dune restoration, green infrastructure, accessibility improvements, public education + outreach

Kollen Park Green Infrastructure, Holland, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Access issues

Solution

Development of waterfront via 2020 Community Vision document

Lake Bluff Beach Habitat Project, Lake Bluff, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure

Solution

Beach stabilization, native plantings, accessibility improvements, habitat creation, water quality improvement

Lakefront Resilience Plan – Long Beach, Long Beach, IN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Master Plan

Hazard

Erosion, stormwater runoff, access issues

Solution

Lakefront Resilience Master Plan

Lakefront Resilience Plan – Ogden Dunes, Ogden Dunes, IN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Master Plan

Hazard

Erosion, lake levels, access issues

Solution

Coastal Protection Master Plan, accessibility improvements

Lakeshore Road Resilience, Grosse Pointe Shores and Grosse Pointe Farms, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Erosion, lake levels

Solution

Shoreline softening, native plantings, accessibility improvements

Lakeside Park Beach Restoration, Rogers City, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Project Implementation Framework + 60% Design

Hazard

Flooding, stormwater runoff, water quality

Solution

Dune establishment, vegetated stone swale, native plantings, pollinator gardens

Lighthouse Beach, Evanston, IL

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

90% Design

Hazard

Erosion

Solution

Dune restoration, native plantings, accessibility improvements

Lincoln Park South Lagoon Shoreline Resilience, Chicago, IL

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Erosion, failing infrastructure

Solution

Shoreline softening, native plantings, accessibility improvements

Lions Park Enhancement Project, Sandusky, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure

Solution

Infrastructure improvements, beach creation, native plantings, shoreline softening

Little Calumet River Enhancements and Restoration, Portage, IN

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, water quality, lake levels, habitat loss, access issues

Solution

Stormwater infrastructure improvements, wetland restoration, river naturalization, accessibility improvements

McCormick Ravine Bluff and Nearshore Habitat Enhancement and Restoration Project, Lake Forest, IL

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Erosion

Solution

Offshore reef creation, toe protection, bluff revegetation

Mikiinak Shack Shack Site Shoreline Stabilization and Park Improvements, Kewaunee Bay Indian Community, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, flooding, habitat loss

Solution

Native plantings, coir logs, submerged aquatic vegetation

North Branch Ecorse Creek Bridge and Culvert Replacement & Stream Restoration, DCC, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, stormwater runoff, water quality, habitat loss

Solution

Infrastructure improvements, dredging, stream restoration

North Branch Ecorse Creek Greenway and Trail Corridor, DCC, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Access issues, habitat loss, flooding, stormwater runoff

Solution

Habitat creation, accessibility improvements

North Branch Ecorse Creek One-Mile Pilot Restoration, DCC, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Streambank erosion, flooding, degraded water quality, limited habitat, stormwater management

Solution

Green infrastructure, stream restoration, bridge and culvert replacements, accessibility improvements, habitat creation

North Branch Ecorse Creek Stream Corridor & Ecosystem Restoration-One-Mile Pilot Design, DCC, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Executive Coaching + 30% Design

Hazard

Erosion, flooding, water quality, habitat loss, stormwater runoff

Solution

Flood control basins, contaminated site cleanups, stream restoration, habitat creation, bridge and culvert replacements, accessibility improvements, brownfield remediation

North Coast Shoreline Resilience and Habitat Restoration, Cleveland, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Master Plan and Funding Strategy

Hazard

Habitat loss

Solution

Wetland creation, shoreline softening

North Shore Coastal Resilience, Duluth, MN

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Flooding, erosion, water quality

Solution

Native plantings, rain gardens, infrastructure relocation, accessibility improvements

Northern Landing and Chief Wawatam Park Restoration, St. Ignace, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure, habitat loss, stormwater runoff, access issues

Solution

Shoreline stabilization, infrastructure improvements, accessibility improvements, marine debris removal, habitat creation/restoration

Openlands Lakeshore Preserve Shoreline Protection Project, Highland Park, IL

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Erosion

Solution

Offshore reef creation, toe protection, bluff revegetation

Oscoda Beach Park Dune Restoration and Stormwater Runoff Project, Oscoda Township, MI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Project Implementation Framework + 90% Design

Hazard

Flooding, stormwater runoff, erosion

Solution

Dune establishment, native plantings, green infrastructure, shorebird habitat creation

Ottawa River Shoreline Restoration and Trail Project, Toledo, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design

Hazard

Erosion, habitat loss, access issues

Solution

Wetland restoration, invasive species removal, shoreline softening, bank stabilization, accessibility improvements

Ox Creek and St. Joseph River Riparian Restoration, Benton Harbor, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Flooding, erosion, habitat loss, access issues

Solution

Streambank stabilization, habitat restoration, green infrastructure, accessibility improvements

Park Point Recreation Area Coastal Resilience, Duluth, MN

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Flooding, erosion, water quality

Solution

Shoreline stabilization, shoreline softerning, accessibility improvements

Pentwater Beachfront Restoration Project, Pentwater, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy + 60% Design + 90% Design (pending)

Hazard

Water quality, access issues

Solution

Dune restoration, native plantings, accessibility improvements

Pike River Mouth Improvements Project, Kenosha, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + Alternatives Analysis and Design Feasibility Study

Hazard

Flooding, access issues, habitat loss, water quality

Solution

Breakwaters, green infrastructure, water quality improvements, shoreline softening

Reimagining an Industrial Lakefront: Wendy Park Habitat Restoration and Creation, Cleveland, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Habitat loss, erosion

Solution

Habitat restoration, floating wetlands, native plantings

Resilient Planning and Design for Barker’s Island Shoreline, Superior, WI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

90% Design

Hazard

Erosion, lake levels

Solution

Woody headlands and reefs, species management, native plantings, vegetated revetment, accessibility improvements

Restoration and Bank Stabilization at Keweenaw Waterway, City of Houghton, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, stormwater runoff, failing infrastructure, land use change

Solution

Stream restoration and stabilization, wetland mitigation, native plantings

Restoring Resilience in Central Park & Faxon Creek Watershed, Superior, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Flooding, invasive species, failing infrastructure, stormwater runoff

Solution

Stream restoration, stormwater management, floodplain management, invasive species management, habitat enhancement

River Point Peninsula Riparian Stabilization, Manitowoc, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure, habitat loss

Solution

Shoreline stabilization, bank stabilization, native plantings

Rocky River Park Shoreline Enhancement Project, Rocky River, OH

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure

Solution

Infrastructure improvements, beach creation, native plantings, shoreline softening

Rotary Park Improvements, Trenton, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Lake levels, flooding, erosion, failing infrastructure, access issues

Solution

Shoreline stabilization, infrastructure improvements, accessibility improvements

Safeguarding Bayfield: Ravine Stabilization and Flood Resilience Initiative, Bayfield, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Stormwater runoff

Solution

Flood mitigation study, modeling, ravine stabilization, stormwater infrastructure

Sheboygan Northern Bluffs Stabilization Project, Sheboygan, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design + 90% Design (pending)

Hazard

Lake levels, erosion, stormwater runoff

Solution

Bluff stabilization, accessibility improvements, beach fill

Sherman Park Shoreline Project, Sault Ste Marie, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, failing infrastructure, access issues, stormwater runoff, habitat loss

Solution

Infrastructure improvements, beach nourishment, native plantings, rain gardens, green infrastructure, accessibility improvements

Shiloh Boulevard Rehabilitation Project, Zion, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Failing infrastructure, stormwater runoff, access issues

Solution

Green infrastructure, habitat enhancement, accessibility improvements

Shoreline Improvements and Water Plant Protection Project, Glencoe, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, stormwater, failing infrastructure

Solution

Infrastructure updates, cobble beach nourishment, invasive species removal, native plantings, accessibility improvements

Shoreline Protection on Lake Shore Blvd, Marquette, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion

Solution

Beach nourishment, rock sill, cobble beach, native plantings, restoration of existing ridge/swale and coastal dunes

Shoreline Stabilization at Dee Seawall Site, City of Houghton, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Failing infrastructure, erosion

Solution

Shoreline stabilization, native plantings, wildlife habitat, accessibility improvements

Shoreline Vulnerability Study, South Haven, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Erosion, flooding

Solution

Beach nourishment, dune restoration, wetland creation

Siskiwit River Sedimentation Deposits Wholistic Re-Evaluation and Upstream Analysis, Cornucopia (Town of Bell), WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Water quality

Solution

Feasibility study for wholistic, affordable solutions (vegetation, natural channel, hard armoring, etc.)

St. Joseph River Ecological Restoration, Buchanan, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy and 30% Design

Hazard

Erosion, flooding, invasive species, access issues

Solution

Habitat creation/restoration, shoreline stabilization, accessibility improvements

Stormwater Management and Flood Mitigation, Sturgeon Bay, WI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Flooding, stormwater runoff

Solution

Stormwater management

Stream Bank Stabilization at Covenant Park, Kentwood/Calvin University, MI

CI Program(s):

IRGLC

Funding Source(s)

GLRI

Funding Agency/Agencies:

NOAA

Phase

60% Design

Hazard

Stormwater runoff, water quality, erosion

Solution

Shoreline stabilization, native plantings, wetland shelfs, accessibility improvements

Valley Creek Resiliency Planning – Guenther Pond Restoration, Port Washington, WI

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

Project Implementation Framework + 60% Design

Hazard

Stormwater runoff

Solution

Wetland reestablishment, native plantings, accessibility improvements

Walter and Mary Burke Park Restoration, New Baltimore, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Erosion, lake levels

Solution

Infrastructure improvements, offshore wave attenuation structures, beach enhancement, accessibility improvements

Water Treatment Plant Protection, Ludington, MI

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Grant Matrix/Funding Strategy

Hazard

Erosion, lake levels

Solution

Shoreline stabilization, native plantings

Waterfront Revitalization on Agate Bay, Two Harbors, MN

CI Program(s):

IRGLC + RCPI

Funding Source(s)

GLRI + BIL

Funding Agency/Agencies:

NOAA + NFWF

Phase

60% Design + 90% Design (pending)

Hazard

Stormwater runoff, erosion, water quality, invasive species, habitat loss

Solution

Habitat restoration, cobbe beach, planted revetment, rain garden, accessibility improvements

Relevant Links:

Waukegan River Ravines Corridor Project, Waukegan, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design + 90% Design (pending)

Hazard

Erosion, water quality, habitat loss, stormwater runoff, access issues

Solution

Streambank + ravine stabilization, invasive species removal, stream restoration, stormwater infrastructure , accessibility improvements

Wiese Park Flood Restoration and Habitat Enhancement, Allouez, WI

CI Program(s):

RCPI

Funding Source(s)

FFLM

Funding Agency/Agencies:

FFLM

Phase

30% Design (pending)

Hazard

Flooding, erosion, water quality

Solution

Stormwater/flood mitigation, shoreline stabilization, ecological restoration

Winnetka Public Infrastructure & Access Protection, Winnetka, IL

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework

Hazard

Failing infrastructure, flooding, erosion, access issues

Solution

Shoreline softening, infrastructure improvements, native plantings, beach nourishment, public education + outreach

Wright Park Beach Erosion Protection and Restoration, Dunkirk, NY

CI Program(s):

RCPI

Funding Source(s)

BIL

Funding Agency/Agencies:

NFWF

Phase

Project Implementation Framework + 60% Design

Hazard

Lake levels, flooding, erosion, stormwater runoff, failing infrastructure

Solution

Bluff fortification, beach restoration, infrastructure improvements, offshore breakwaters, nearshore habitat creation